APSC Current Affairs: Assam Tribune Notes with MCQs and Answer Writing (08/11/2026)
In this post
For APSC CCE and other Assam competitive exam aspirants, staying consistently updated with reliable current affairs is essential for success. This blog provides a well-researched analysis of the most important topics from The Assam Tribune dated 08 November 2026. Each issue has been carefully selected and explained to support both APSC Prelims and Mains preparation, ensuring alignment with the APSC CCE syllabus and the evolving trends of the examination.
For working professionals and full-time aspirantsAPSC CCE Foundation Programme₹24,999 Current Affairs Notes
From The Assam Tribune, 8 November 2026
Amur Falcon Roost at Dharamtul and Industrial Siting
Open this topic as a separate page, with its MCQs →
Syllabus Mapping
- Prelims: GS Paper I (General issues on Environment, ecology, biodiversity and climate change; Current events of State/National importance).
- Mains: GS Paper III (Conservation, environmental pollution and degradation, environmental impact assessment); GS Paper V (Assam syllabus: environment, wildlife and natural resources of Assam).
Why in News? An opinion piece by Bijoyinee Sarma appeared in the Sunday pages of The Assam Tribune (8 November 2026). It warns that the Amur falcon roost at Dharamtul in Morigaon district is at risk. The threat comes from industries proposed near the Kopili river. The writer says the draft Environmental Impact Assessment (EIA) reports of many of these projects do not mention the falcons at all.

Current Context (The Trigger)
- The roost: Dharamtul is a plains area near Jagiroad in Morigaon district. Its wetlands are surrounded by paddy fields and lie close to the Kopili river.
- Falcon visits: According to the writer, the falcons arrive mainly in November and remain for about 15 to 20 days. They perch in rows on electric wires and hunt over the fields and wetlands.
- Proposed industry: The writer says many constructions are planned on paddy land near Pub Dharamtul and Bhalukaguri. These sites are just 80 metres from the Kopili. A cement plant already runs near Jagiroad in the same district.
- Claimed gaps in the draft EIA: The writer says the draft EIA reports of many projects never name the Amur falcon. Some are also criticised for leaving elephants out of their wildlife plans and for making no study of river dolphins.
- Local view: Local conservationists say falcon numbers have fallen since construction began. Some villagers have opposed a few projects and allege they were kept out and not allowed to speak.
Core Concepts & Static GK
- The species: The Amur falcon (Falco amurensis) is a small bird of prey. The writer says it breeds in south-eastern Siberia, Mongolia and northern China and spends the winter on the grasslands of southern Africa. The full round trip is about 22,000 km.
- Sea crossing: On the way the birds cross the Arabian Sea. The writer puts this non-stop flight over open water at roughly 2,400 to 3,150 km.
- Refuelling stop: The falcons use the North-East to build up energy for this crossing. For weeks they feed on insects, mainly winged termites, which swarm after the autumn rains.
- Global status: The Convention on Migratory Species (CMS) has listed the Amur falcon in Appendix II since 1979. Its IUCN Red List status is Least Concern.
- Stopover habitat: A migratory bird needs a chain of safe resting sites. The writer’s central argument is that losing one such site can harm the species even after hunting has stopped.
Constitutional & Legal Framework
- Community reserve: Section 36C of the Wild Life (Protection) Act, 1972 lets the State Government declare private or community land as a community reserve. It applies where a community or an individual has volunteered to conserve wildlife and its habitat. The land must not already be inside a national park, sanctuary or conservation reserve.
- Land-use rule: Once a community reserve is notified, its land-use pattern cannot be changed. This needs a resolution of the management committee and approval of the State Government. Section 36D provides for this Community Reserve Management Committee.
- Origin: Sections 36A to 36D, covering conservation reserves and community reserves, were added by the Wild Life (Protection) Amendment Act, 2002. These provisions came into force on 1 April 2003.
- EIA stages: The EIA Notification, 2006 sets out up to four stages: screening, scoping, public consultation and appraisal. Screening applies only to Category B projects.
- Project categories: Category A projects need clearance from the Central Government on the advice of an Expert Appraisal Committee. Category B projects are cleared by the State Environment Impact Assessment Authority (SEIAA). The State Expert Appraisal Committee sorts them into B1 (EIA required) and B2 (no EIA).
Institutional Machinery
- Expert Appraisal Committee: At the scoping stage the appraisal committee fixes the Terms of Reference for the EIA study. If it does not convey them within 60 days, the Terms of Reference suggested by the applicant are treated as final.
- Public hearing: The Member-Secretary of the State Pollution Control Board fixes the date, time and venue within 7 days of receiving the draft EIA. The hearing is advertised in one national daily and one regional vernacular daily.
- Hearing rules: The public gets at least 30 days’ notice to respond. The Board must video film the entire proceedings, and the hearing must be completed within 45 days of the applicant’s request.
- Village councils: Near the Doyang reservoir in Nagaland, village councils signed an agreement with the Wildlife Trust of India and Natural Nagas in August 2013. They declared hunting of Amur falcons illegal in their areas and set a fine of Rs 5,000.
Assam & Northeast Linkages
- Known gatherings: The writer lists the big roosts in the hills. These are Pangti village beside the Doyang reservoir in Nagaland, the Tamenglong villages of Manipur and Umrangso in Assam’s Dima Hasao. Small pockets in Karbi Anglong and Morigaon are also named.
- Count: Bird counters put the number at more than 200,000 falcons across some of these sites on a single November evening in 2022.
- From hunters to protectors: Just over ten years ago, falcons were netted in tens of thousands in these hills. Village councils, eco-clubs and forest staff later won the hunters over to protect the birds.
- Doyang protection squad: The Wildlife Trust of India reported that an Amur Falcon Protection Squad of former hunters patrolled the Doyang roost in 2013. They worked with Nagaland Forest Department staff. No falcon was reported killed at the roost that season.
- Habang lesson: Habang in West Karbi Anglong was once a roost for thousands of falcons. As human disturbance grew, the birds stopped coming one year.
- The Kopili: The Kopili is a south-bank tributary of the Brahmaputra. It flows through Assam’s hill districts and central Assam before joining the main river.
Prelims Trap Zones (Watch out for)
- Name Trap: The Amur falcon is named after the Amur River region, where it breeds. It does not breed in India. India is only a stopover on the way to Africa.
- Status Trap: The Amur falcon’s IUCN status is Least Concern, not Endangered. The Gangetic river dolphin, by contrast, is Endangered on the IUCN list and is in Schedule I of the Wild Life (Protection) Act, 1972.
- Place Trap: Pangti and the Doyang reservoir are in Nagaland. Umrangso is in Dima Hasao, Habang is in West Karbi Anglong and Dharamtul is in Morigaon.
- Reserve Trap: A community reserve is declared under Section 36C, while a conservation reserve comes under Section 36A. A sanctuary (Section 18) and a national park (Section 35) are separate categories.
- Claim Trap: The fall in numbers at Dharamtul, the missing falcons in the EIA and the lack of legal protection are claims. They come from an opinion piece. They are not official findings.
Introduction
On 8 November 2026, an opinion piece warned about the Amur falcon roost at Dharamtul in Morigaon. It could be lost to industry without any hunter being involved. The writer notes that nearly the whole world population of this falcon is thought to move through North-East India each autumn. So a local planning decision in Assam can affect an entire species. The case tests whether India’s EIA process can protect a stopover that has no legal protection.
Why the Dharamtul Roost Matters
- A refuelling stop: The falcons feed for weeks in the North-East before their long sea crossing to Africa. Losing the Dharamtul wetlands would break one link in a round trip of about 22,000 km.
- Shared habitat: The writer notes that wild elephants from the Amsoi and Kholahat Reserve Forests use the same area. Gangetic river dolphins have also been confirmed in the Kopili recently, for the first time.
- Documented sightings: Local conservationists have recorded the falcons here since about 2001. Their records once showed several thousand birds, but the number is said to be falling slowly.
- Water dependence: Conservationists warn that drawing large amounts of groundwater could dry out the wetlands. They also fear effluent could flow into the Kopili through the channels that connect the fields and wetlands to the river.
- Community pride: In the hills of Nagaland, Manipur and Dima Hasao, villages now celebrate the return of the birds every season. This shows that conservation can become part of a community’s identity.
Gaps in the Siting Process (as alleged)
- Species left out: The writer says the draft EIA does not name the Amur falcon despite years of recorded sightings. A baseline study that skips the main species cannot judge the impact on it.
- Elephants and dolphins: Some plans are criticised for ignoring elephants in the wildlife plan. Others are said to have made no study of the river dolphins.
- Distance from the river: The proposed constructions on paddy land are said to be just 80 metres from the Kopili river. Such closeness raises the risk of effluent reaching the river.
- Voice of villagers: Villagers allege they were kept out and not allowed to speak. Yet the EIA Notification, 2006 requires a public hearing with at least 30 days’ notice for Category A and B1 projects.
- No legal cover: The writer says the Dharamtul wetlands have no legal protection, so no automatic limits apply. Pesticide use on the surrounding fields and new power lines add the risk of collision and electrocution.
Challenges
- Development versus habitat: A cement plant already runs near Jagiroad, and other heavy industries are also eyeing Morigaon. Each new unit competes with the wetland for land and water.
- Weak baseline data: The main record of falcons at Dharamtul comes from local conservationists since about 2001. If such local records are not used, an EIA can easily miss the species.
- Unprotected stopovers: Hunting is now checked in the hills, but Dharamtul’s wetlands have no status like a sanctuary or national park. The writer warns that falcons saved from hunters can still be lost if their resting places go.
- Procedure without participation: A public hearing is advertised in a national and a regional daily, but villagers say they could not speak. A hearing where people are not heard loses its purpose.
- Cumulative impact: Water drawal, effluent, pesticides and power lines may each look small. Together they can empty a roost, as Habang showed when the birds stopped returning after disturbance grew.
- Self-reported monitoring: The EIA Notification, 2006 requires half-yearly compliance reports, due on 1 June and 1 December. These reports are filed by the project itself, so strict follow-up depends on regulators checking them on the ground.
Way Ahead
- Independent ecological study: The writer asks for an independent study of the wetland before any decision on the cement unit. It should cover the Amur falcons, the elephants and the Kopili’s dolphins, and the State Forest Department with a research body can carry it out.
- Answer the EIA gaps in public: The writer wants the weak points of the draft EIA answered openly. The Pollution Control Board, Assam, which conducts the hearing, should record the replies and make them public.
- Hear the villagers: Families living next to the site should get a full hearing. The video film of the hearing, already required under the Notification, can show whether this happened.
- Water and pollution safeguards: The writer says no industry should be permitted to dry up or pollute the wetland. Regulators can attach binding limits on groundwater drawal and effluent discharge as conditions of clearance.
- Seasonal buffer: A buffer zone around the wetland should keep heavy construction out during the falcon season, which is mostly November.
- Community reserve: In the longer run, the writer suggests a community reserve for the wetlands. Under Section 36C the State Government can declare one on community land, while day-to-day care stays with the villages.
- Safer power lines: Power utilities can mark or insulate the new lines near the roost. This would cut the collision and electrocution risk that the writer raises.
Conclusion
If the writer’s account is right, Dharamtul shows that a migratory stopover can vanish because of a planning file and not a hunter’s net. A proper bird count, an open hearing and a community reserve would let industry and the falcons share Morigaon on fair terms. The real test is whether the hills’ success, where hunters became protectors, can be repeated on the plains of Assam.
Asked in APSC
- APSC Mains 2025, GS Paper 5 (10 marks): A private company proposes to establish a manufacturing unit in Assam. Two possible locations are available—one near a protected forest with transport facilities and another in a remote district with limited infrastructure. As a policy-maker, which location would you approve? Give reasons for your decision.
- APSC Mains 2020, GS Paper 3 (15 marks): What is Environmental Impact Assessment (EIA)? Why is it imperative to carry out an EIA of any large industrial infrastructure project?
Riverbank Erosion Displaces Villages in Darrang
Open this topic as a separate page, with its MCQs →
Syllabus Mapping
- Prelims: GS Paper I (General issues on Environment, ecology and disaster management; Current events of State/National importance).
- Mains: GS Paper III (Disaster and disaster management; conservation and environmental issues); GS Paper V (Assam: flood, erosion and rehabilitation issues; physical features and rivers of Assam).
Why in News? The Assam Tribune of 8 November 2026 reports from Mangaldai (dateline 7 November) on severe Brahmaputra erosion in Darrang district. Over the last few weeks, the river has wiped out large parts of villages in the Mangaldai and Sipajhar revenue circles. Schools, a health sub-centre and homes have gone into the river, and the Water Resources Department says it is still waiting for flood-fighting material.
Current Context (The Trigger)
- Worst-hit villages: Aporia, Borala Khaity and Bhokelikanda under Rangamati Mouza of Mangaldai Revenue Circle are the worst affected.
- Aporia: Locals say the river has taken almost all of Aporia. Aporia LP School, No. 1 Paschim Aporia LP School, No. 2 Paschim Aporia LP School and the Aporia Health Sub-Centre are gone. Dozens of families have moved away.
- Borala Khaity: Locals say No. 3 Borala Khaity has vanished and half of No. 2 is under water. The Borala Khaity Jana Kalyan High School, once a polling centre, has been lost.
- Next in line: Gram Pradhan Babul Deka says three things in Borala Khaity are close to collapse. They are the Chaulkhowa Rawmari Anchalik High School, a newly built health sub-centre and several temples.
- Official estimate: Circle Officer Tanmoy Bora of Mangaldai Revenue Circle estimated that nearly 60 families (about 300 people) are affected in that area. About 200 bigha of land is affected too. He said char land is hard to demarcate because it is alluvial.
- Relief delay: Jiten Das, Executive Engineer of the Mangaldai Water Resources Division, said the division plans temporary work with porcupines within a week. Because such material is supplied only in flood time, it is waiting for a government supply.
- Spread: In Sipajhar Revenue Circle, Dholpur and other villages along the river now face serious erosion too.
Core Concepts & Static GK
- Riverbank erosion: It is the wearing away of a river bank by flowing water. Unlike a flood that recedes, erosion removes the land itself, so homes, farms and village boundaries are lost for good.
- Scale in Assam: A study cited by the Assam Water Resources Department finds that rivers have eroded 4.27 lakh hectares since 1950. That is about 7.40 per cent of the state. The average annual erosion is about 8,000 hectares.
- In the Assembly: In July 2021, Water Resources Minister Pijush Hazarika spoke in the Assam Assembly. He said the state had lost about 4.27 lakh hectares to Brahmaputra erosion.
- Char: A char is a sandbar or river island built of alluvium. The Circle Officer says its alluvial nature makes land demarcation hard.
- Porcupine: A porcupine is a tetrahedron-shaped frame, often of reinforced concrete, placed in rows along a bank. It slows the current and makes the river drop silt, and Assam has used it widely on the Brahmaputra.
Constitutional & Legal Framework
- Brahmaputra Board Act, 1980: This Act of Parliament (No. 46 of 1980) received presidential assent on 1 September 1980. It set up a Board to plan and implement flood and bank-erosion control in the Brahmaputra Valley.
- Master plans: Under the Act the Board prepares a Master Plan for flood control, bank erosion and drainage improvement. The Central Government approves it after consulting the states concerned.
- Disaster list: River erosion is not on the notified list of disasters for the National and State Disaster Response Funds (NDRF and SDRF). The notified list covers events such as cyclone, drought, earthquake, fire, flood, landslide and cold wave.
- State-specific disaster: Assam has notified erosion as a state-specific disaster. Under the SDRF norms, a state may spend up to 10 per cent of its SDRF funds on such locally notified disasters.
Institutional Machinery
- Water Resources Department, Assam: Its Mangaldai division handles anti-erosion work in Darrang. The Gram Pradhan says its staff visited and took photographs, but no work is visible yet.
- Brahmaputra Board: It is a statutory body under the Ministry of Jal Shakti, with headquarters in Guwahati.
- Revenue and Disaster Management Department, Assam: It handles relief for erosion-hit families. It told the Assembly on 10 July 2026 that such families now get a Rehabilitation Grant under SDRF norms.
- NDMA and the DDMA: The Home Ministry directed the National Disaster Management Authority (NDMA) to act. The NDMA drafted a national policy on people displaced by river and coastal erosion. It makes the District Disaster Management Authority (DDMA) the main body for mitigation and rehabilitation.
Schemes & Initiatives
- FMBAP: On 21 February 2024 the Union Cabinet approved the Flood Management and Border Areas Programme (FMBAP) for 2021-26. The total outlay is Rs 4,100 crore.
- Two components: The Flood Management Programme (FMP) has Rs 2,940 crore and River Management and Border Areas (RMBA) has Rs 1,160 crore.
- Funding share: Under FMP, special category states, including the eight North-Eastern states, get 90 per cent central and 10 per cent state funding. General states get 60:40, and RMBA works on common border rivers get 100 per cent central assistance.
- Assam release: A written Lok Sabha reply was reported on 6 August 2026. It said the Centre released Rs 342.63 crore to Assam under FMBAP over five years. The reply also said a Rs 207-crore project to protect Majuli from erosion is complete.
- Finance Commission windows: For 2021-26, the 15th Finance Commission recommended Rs 1,500 crore from the National Disaster Mitigation Fund for erosion mitigation. It also kept Rs 1,000 crore from the NDRF for resettling people displaced by erosion.
- Rehabilitation rules: Assam issued a notification on 18 November 2023. It rescinded the two earlier rehabilitation policies for erosion-affected families, because they did not match SDRF/NDRF norms. Families now get a Rehabilitation Grant under SDRF norms if they qualify for land allotment under the Land Policy, 2019.
Reports, Indices & Data
- Total loss: About 4.27 lakh hectares have been eroded since 1950, which is 7.40 per cent of Assam’s area.
- Yearly loss: The average annual erosion is about 8,000 hectares, so the total keeps growing every season.
- Homeless versus affected: In a July 2026 Assembly reply, the government gave two counts for Baghbar constituency in Barpeta. It said 7,552 families were affected, but only 450 were made homeless by erosion since 2015. This shows how “affected” and “homeless” counts can differ.
- Central release: A Rajya Sabha reply of December 2025 gave the national figure. Since FMBAP began, central assistance of Rs 8,737.66 crore has been released to states and Union Territories.
Assam & Northeast Linkages
- Darrang geography: Darrang lies on the north bank of the Brahmaputra, and the river forms its southern boundary. Mangaldai is its headquarters.
- Months of warning: The Gram Pradhan of Borala Khaity says erosion has threatened No. 1 Borala Khaity for about six months. Yet he sees no action on the ground.
- Farmer families: He warned that nearly 100 indigenous farmer families could lose their homes soon if protection work is not taken up.
- Old demand: In 2015 the Assam Assembly passed a resolution asking that river erosion be included in the NDRF and SDRF guidelines.
Prelims Trap Zones (Watch out for)
- Base Year Trap: The 4.27 lakh hectare loss is counted from 1950. It is a total over seven decades, not a yearly figure; the yearly average is about 8,000 hectares.
- Family Count Trap: The headline says over 100 families are homeless. The Circle Officer estimated nearly 60 families affected, and the Gram Pradhan warned that nearly 100 farmer families are at risk. Read whose estimate the stem asks for.
- Scheme Share Trap: FMP gives North-Eastern states 90:10 funding, not 100 per cent. Only the RMBA component is 100 per cent central.
- Disaster Status Trap: Erosion is a state-specific disaster in Assam, but it is not on the NDRF/SDRF notified list. A state may use only up to 10 per cent of its SDRF funds for such disasters.
- Outlay Trap: The FMBAP total is Rs 4,100 crore, split Rs 2,940 crore (FMP) and Rs 1,160 crore (RMBA). Do not swap them.
- Scheme Status Trap: Assam’s older erosion rehabilitation policies were rescinded in November 2023. Rehabilitation now follows SDRF norms and the Land Policy, 2019.
Introduction
Over the last few weeks, the Brahmaputra has swallowed large parts of Aporia and Borala Khaity in Darrang. Three LP schools, a health sub-centre and a high school that served as a polling centre went with them. Assam has lost about 4.27 lakh hectares to its rivers since 1950, so such losses are a long-running pattern, not a one-off accident. The story tests how well the state protects people whose land simply disappears.
Causes and Impact
- Loss of public services: Three LP schools and a health sub-centre in Aporia went into the river. Children and patients lose nearby services together with their homes.
- Loss of homes and land: The Circle Officer put the damage at nearly 60 families and about 300 people in the area. About 200 bigha of land is also affected. Dozens of families have already moved to safer ground.
- Livelihood risk: The Gram Pradhan warns that nearly 100 indigenous farmer families in the threatened parts of Borala Khaity could lose their homes. For farmers, losing land also means losing income.
- Annual drain on land: Assam loses about 8,000 hectares a year on average. So every season adds new families to the pool of displaced people.
- Uncertain land records: Char land is alluvial and hard to demarcate. This weakens the papers that families need to claim rehabilitation.
- Wider spread: Dholpur and other riverine villages in Sipajhar are also hit. So the problem is not limited to one mouza.
Government Initiatives (National & Assam)
| Level | Initiative | Purpose & Impact |
|---|---|---|
| Centre | FMBAP 2021-26 (Rs 4,100 crore) | Funds flood control, anti-erosion and drainage works. Special category states get 90:10 funding under FMP. |
| Centre | River Management and Border Areas (Rs 1,160 crore) | Covers flood and erosion work on common border rivers with 100 per cent central assistance. |
| Centre | Brahmaputra Board (Act of 1980) | Prepares master plans for flood control, bank erosion and drainage in the valley. |
| Centre | 15th Finance Commission windows | Rs 1,500 crore for erosion mitigation and Rs 1,000 crore for resettling displaced people in 2021-26. |
| Centre to Assam | Rs 342.63 crore under FMBAP in five years; Rs 207-crore Majuli project | Central support for flood and erosion works; the Majuli erosion-protection project is complete, as per a 2026 Lok Sabha reply. |
| Assam | Rehabilitation Grant under SDRF norms | Since the November 2023 notification, erosion-hit families get this grant if they qualify for land under the Land Policy, 2019. |
Challenges
- Slow response: The Gram Pradhan says officials visited and took photographs but no work is visible. The department says it is still waiting for material.
- Seasonal supply: Flood-fighting material such as porcupines is supplied only in flood time. So erosion outside the flood season finds the division without stock.
- Funding cap: Erosion is not on the NDRF/SDRF notified list. Assam can use only up to 10 per cent of its SDRF funds for state-specific disasters like erosion.
- Weak land proof: Alluvial char land is hard to demarcate. Families without clear records may fail to qualify for land and the Rehabilitation Grant.
- Paperwork delays: In Barpeta, the state told the Assembly in July 2026 about a delay. Many relief proposals were sent back for re-verification due to lack of documents. Similar hurdles can slow relief in Darrang.
- Shifting policy: Assam rescinded its earlier erosion rehabilitation policies in November 2023. Families and officials have to work through new rules while the river keeps moving.
Way Ahead
- Stock materials early: The Water Resources Department should stock porcupines and other flood-fighting material before the lean season. Then the Mangaldai division need not wait for a supply when erosion strikes.
- Treat erosion as a calamity: The Centre can consider adding river erosion to the NDRF/SDRF list, as the Parliamentary Standing Committee on Water Resources recommended. This would free Assam from the 10 per cent limit.
- Use the DDMA: The NDMA draft policy makes the District Disaster Management Authority the main body for erosion work. Darrang’s DDMA can map and watch the vulnerable stretches near Rangamati Mouza and Sipajhar.
- Map with remote sensing: The draft policy calls for mapping erosion-prone areas and building a database. Sharing these maps with panchayats would give villages early warning.
- Use central windows: Assam should draw on FMBAP and the Finance Commission’s erosion mitigation and resettlement windows for priority reaches like Aporia and Borala Khaity.
- Fast rehabilitation: The Revenue and Disaster Management Department should settle land records of char families quickly. Then the Rehabilitation Grant under SDRF norms can reach them without long re-verification.
Conclusion
The loss of Aporia and Borala Khaity shows that erosion is a slow disaster with a very sharp end for each family. Money exists on paper through FMBAP and the Finance Commission windows. But protection reaches villages only when material and clear responsibility reach the ground in time. A district-level plan, early stocking and quick land settlement would turn relief from reaction into routine.
Asked in APSC
- APSC Mains 2023, GS Paper 5 (10 marks): Discuss the social and economic impacts of the Brahmaputra river erosion in Assam.
E20 Ethanol-Blended Petrol Quality Row
Open this topic as a separate page, with its MCQs →
Syllabus Mapping
- Prelims: GS Paper I (Indian Economy; Science and Technology; Environment and Ecology; Current events of State/National importance).
- Mains: GS Paper III (Infrastructure: Energy; Economic Development; Technology; Environment); GS Paper V (Economic Development of Assam).
Why in News? On Saturday (7 November 2026) the Ministry of Petroleum and Natural Gas said tests of 893 samples met the prescribed standard for 20 per cent ethanol-blended petrol (E20). The samples came from 27 states and Union Territories, including 56 in Karnataka. The Karnataka government’s food and consumer department had claimed that some retail outlets sold petrol with 26-31 per cent ethanol. The oil companies have questioned how those tests were done.
Current Context (The Trigger)
- Centre’s claim: The ministry said Indian Oil Corporation (IOC), Bharat Petroleum Corporation (BPCL) and Hindustan Petroleum Corporation (HPCL) tested the samples. They found ethanol in all 893 samples within the 19-21 per cent range. This range is set under the Bureau of Indian Standards (BIS) specification IS 17021.
- Karnataka samples: The ministry said the 56 samples tested in Karnataka showed 19-20 per cent ethanol, with an average of 19.30 per cent.
- Karnataka’s claim: A press release of Karnataka’s Department of Food, Civil Supplies, Consumer Affairs and Legal Metrology said samples from some outlets held 26-31 per cent ethanol. This is a dispute reported by the paper, and the two sides’ figures are not reconciled.
- Objections to the October test: The three oil marketing companies (OMCs) said Karnataka’s October 2026 exercise did not follow the prescribed statutory procedure. It also did not disclose technical details of the tests. They said they did not get the retention samples, outlet-wise details or laboratory reports.
- Density argument: The OMCs pointed out that the Karnataka samples showed a density of 0.742-0.749 g/cc. Their own E20 samples showed 0.752-0.760 g/cc. They said ethanol is denser than petrol, so more ethanol should raise density.
- Water checks at pumps: IOC, BPCL and HPCL have told petrol pumps to test their underground tanks and dispensing nozzles for water. The checks come at intervals of two to eight hours. The interval is set by local weather. IOC and HPCL outlets are expected to check every two to four hours, and BPCL has set a check every eight hours.
Core Concepts & Static GK
- Ethanol blending: Ethanol is mixed with petrol, and E20 means a blend with about 20 per cent ethanol. India’s average blending was 19.2 per cent in Ethanol Supply Year (ESY) 2024-25 and 20 per cent in ESY 2025-26 (November to June).
- Blending trend: The government lists blending as about 8.1 per cent in ESY 2020-21. It was 10.0 per cent in 2021-22, 12.1 per cent in 2022-23 and 14.6 per cent in 2023-24.
- Hygroscopic fuel: Ethanol absorbs moisture from the air. If water gets into E20, the ethanol leaves the petrol and joins the water. This mixture settles as a separate layer under the fuel in the tank, and the process is called phase separation.
- Feedstocks: The 2018 National Policy on Biofuels allowed ethanol from several sources. These were sugarcane juice, sugar-containing materials such as sugar beet and sweet sorghum, and starch-containing materials such as corn and cassava. Damaged food grains such as wheat and broken rice were also allowed. The government says the 2018 policy widened the base beyond sugarcane to maize and surplus grain.
- Octane benefit: The government says E20 has a Research Octane Number of about 108.5 against 84.4 for petrol. It claims this lifts the effective octane rating of Indian petrol to around 95.
- Sampling rule: The Motor Spirit and High Speed Diesel Order, 2005, read with the Marketing Discipline Guidelines 2024, says six one-litre samples are drawn in an inspection. The dealer gets two, the oil company or the inspecting department keeps two, and an authorised laboratory tests the last two.
Constitutional & Legal Framework
- Statutory order: The Motor Spirit and High Speed Diesel (Regulation of Supply, Distribution and Prevention of Malpractices) Order, 2005 governs how fuel samples are drawn.
- Marketing Discipline Guidelines: The MDG 2024 is read with the 2005 Order for the six-sample rule.
- BIS specification: IS 17021 is the BIS standard for E20. It was first issued in 2018 and later amended. The paper gives the permitted range as 19-21 per cent ethanol.
Institutional Machinery
- Ministry of Petroleum and Natural Gas: It issued the statement defending the programme.
- Oil marketing companies: IOC, BPCL and HPCL run close to one lakh petrol pumps between them.
- State Level Coordinator: The OMCs say they asked for outlet details and lab reports through the State Level Coordinator.
- ARAI and SIAM: The Automotive Research Association of India (ARAI) and the Society of Indian Automobile Manufacturers (SIAM) are named. So are the Inter-Ministerial Committee and Indian Oil. The ministry cited the studies of all of these on mileage.
Schemes & Initiatives
- National Policy on Biofuels 2018: It set an indicative 20 per cent ethanol blending target for 2030.
- 2022 amendment: The Union Cabinet approved amendments on 18 May 2022. They advanced the 20 per cent target from 2030 to ESY 2025-26 and allowed more feedstocks.
- PM JI-VAN Yojana: The Cabinet approved it on 28 February 2019 to fund second-generation (2G) ethanol projects using lignocellulosic biomass and other renewable feedstock. The original scheme had an outlay of Rs 1,969.50 crore for 2018-19 to 2023-24. In August 2024 the Cabinet extended it to 2028-29. It also widened it to other advanced biofuels from feedstocks such as farm and forest residues and industrial waste.
- Dedicated ethanol plants: In August 2021 IOCL, BPCL and HPCL invited private investment in dedicated ethanol plants, backed by assured purchase.
Reports, Indices & Data
- Cost claim in dispute: Estimates put the yearly mileage loss from E20 at about Rs 62,000 crore. They put repair costs at Rs 39,000 crore, a total of about Rs 1.01 lakh crore. The government and OMCs challenged these estimates.
- Mileage data: The petroleum ministry’s reply of 12 August 2025 said E20-calibrated vehicles could lose about 1-2 per cent mileage. Some other vehicles could lose 3-6 per cent.
- Government FAQ of 10 July 2026: It says some vehicles may see a 3 to 5 per cent fall in fuel economy. The two ranges differ slightly, so students should quote the source with the number.
- Programme impact claims: The government says the programme has saved over Rs 1.97 lakh crore in foreign exchange since ESY 2014-15. It also claims about 316 lakh metric tonnes of crude oil substituted.
Assam & Northeast Linkages
- Numaligarh bio-refinery: A bamboo-based second-generation (2G) biorefinery has been set up at Numaligarh, Assam, under the JI-VAN scheme. Numaligarh Refinery Limited runs it through a joint venture company, Assam Bio-Ethanol Private Limited.
- Inauguration: The Prime Minister inaugurated the Assam Bioethanol Plant at Numaligarh Refinery in Golaghat district on 14 September 2025.
- Why it matters: The plant makes ethanol from bamboo, so it ties fuel policy to forest and farm produce of the Northeast.
Prelims Trap Zones (Watch out for)
- Dispute versus finding: Karnataka’s 26-31 per cent figure is a claim that the OMCs and the ministry contest, not an established finding. Do not state it as a proven fact.
- Range trap: The permitted range reported under IS 17021 is 19-21 per cent, not “up to 20 per cent” and not 26-31 per cent.
- Sample count trap: The national total is 893 samples across 27 states and Union Territories, of which 56 are from Karnataka.
- Target year trap: The 2018 policy set 2030 for E20, and the 2022 amendment advanced it to ESY 2025-26. Do not mix the two years.
- Six-sample split: Two samples go to the dealer, two are retained, and two go to a laboratory. A common wrong option says four go to the lab.
- Check interval: IOC and HPCL pumps check every two to four hours, and BPCL every eight hours.
Introduction
On 7 November 2026 the Centre said all 893 petrol samples tested in 27 states and Union Territories met the E20 standard. Karnataka’s consumer department claimed some outlets sold petrol with 26-31 per cent ethanol. India reached an average of 20 per cent blending in ESY 2025-26, well ahead of the 2030 date in the original 2018 policy. The row now tests whether a programme meant for energy security can also keep public trust in fuel quality.
Rationale and Progress of Ethanol Blending
- Import dependence: The E20 programme is meant to reduce India’s reliance on crude oil imports and to cut emissions.
- Foreign exchange saved: The government says the programme has saved more than Rs 1.97 lakh crore in foreign exchange since ESY 2014-15.
- Farmer income: The government says over Rs 1.66 lakh crore has gone directly to farmers. It gives the example of maize ethanol bought at around Rs 71.86 per litre before GST, transport and storage costs.
- Emissions: The government says E20 can cut lifecycle carbon emissions by nearly 40 per cent. It also claims about 952 lakh metric tonnes of CO2 emissions reduced since ESY 2014-15.
- Policy speed: The 2022 Cabinet amendment brought the target forward from 2030 to ESY 2025-26. The government says blending reached 20 per cent in November 2025 to June 2026.
- Price stability claim: The government says Delhi petrol rose 5.58 per cent between June 2022 and June 2026. This is a smaller rise than in several other countries it lists. This is the government’s own comparison.
The Sampling Dispute: Procedure, Evidence and Credibility
- Two exercises: The OMCs say the September exercise went through the State Level Coordinator to designated company laboratories. They say the October exercise was reportedly done without their representatives.
- Missing paperwork: The companies say they have not received retention samples, outlet-wise details or lab reports. Without these they cannot verify the 26-31 per cent result.
- Test method gaps: The OMCs say the third-party laboratory certificates did not say which standard method, dilution steps or reference sample was used. This was for the Gas Chromatography test.
- Physical cross-check: The OMCs argue the lower density in the Karnataka samples does not fit a higher ethanol share. This is the companies’ argument and an independent test is still needed.
- Federal angle: A state department claims one result, while central public sector companies and a central ministry claim another. Only a transparent joint test can settle which figure is right.
Government & Statutory Measures
| Level | Initiative | Purpose & Impact |
|---|---|---|
| Centre (policy) | National Policy on Biofuels 2018, amended 18 May 2022 | Set and then advanced the 20 per cent target to ESY 2025-26, and widened feedstocks |
| Centre (scheme) | PM JI-VAN Yojana, approved 2019 and amended 2024 | Funds 2G ethanol and other advanced biofuel projects using biomass and other renewable feedstock, now up to 2028-29 |
| Standards (BIS) | IS 17021 for E20 | Sets the quality yardstick against which the 19-21 per cent range is judged |
| Statutory order | Motor Spirit and HSD Order 2005 with MDG 2024 | Fixes the six one-litre sample rule during inspections |
| Oil companies | Water checks every two to eight hours at pumps | Guards against phase separation in tanks |
| Assam | Bamboo 2G biorefinery at Numaligarh | Makes ethanol from bamboo under the JI-VAN scheme |
Challenges
- Trust deficit: Two official sources give very different numbers for the same fuel, 19-21 per cent against 26-31 per cent. Consumers cannot judge which to believe.
- Vehicle concerns: The programme has come under scrutiny over mileage, engine compatibility and cost to consumers. The ministry’s own figures show a 1-2 per cent loss for calibrated vehicles and 3-6 per cent for others.
- Older vehicles: The government says Maruti Suzuki serviced 2.84 crore cars in FY 2025-26. Of these, 1.5 crore were older vehicles never certified for E20. It found no E20-related damage. This is a company-linked claim and independent studies would add weight.
- Moisture and storage: Ethanol absorbs water, and absorption is highest in hot, humid and monsoon weather and in coastal regions. This raises risk in humid places such as the Brahmaputra valley.
- No choice at the pump: The government says stocking pure petrol, E10 and E20 together would multiply costs and complicate quality control at every outlet. So buyers with older vehicles have no alternative.
- Test capacity and procedure: The row shows that states, companies and third-party labs may use different methods. A shared protocol is missing.
Way Ahead
- Joint independent testing: The Centre and Karnataka should re-test the disputed outlets. The samples should be drawn under the 2005 Order and MDG 2024, with oil company and state officials both present.
- Publish methods: Any laboratory, state or private, should disclose its test method, its dilution steps and the reference sample it used. The OMCs have asked for this.
- Share retention samples: The State Level Coordinator should hand over outlet-wise details and retention samples to the OMCs, which keeps the six-sample rule meaningful.
- Consumer information: The Ministry of Petroleum should publish clear mileage data by vehicle category. It should use the studies of ARAI and SIAM. Then the 1-2 and 3-6 per cent figures are not left open to dispute.
- Tank hygiene: OMCs should enforce the two-to-eight-hour water checks and record them, since phase separation is the main quality risk in storage.
- Grow 2G ethanol: The Centre should speed up projects under PM JI-VAN Yojana, which now runs to 2028-29. Then ethanol need not depend only on food crops.
- Use Assam’s bamboo: The Numaligarh plant can anchor a bamboo supply chain for Assam farmers, supported by the state forest and agriculture departments.
Conclusion
E20 has helped India meet its blending target early, but the Karnataka row shows that numbers alone do not win consumer trust. A jointly supervised test under the statutory procedure, with published methods, would settle the dispute and protect both the programme and the buyer. Over time, second-generation ethanol such as Assam’s bamboo biorefinery can reduce the pressure on food crops.
Agnipath Scheme and Agniveer Tenure Extension
Open this topic as a separate page, with its MCQs →
Syllabus Mapping
- Prelims: GS Paper I (Current events of State/National importance; Indian Polity and Governance; Constitution).
- Mains: GS Paper II (Government policies and interventions; Role of the armed forces in the Indian polity).
Why in News? Defence Minister Rajnath Singh met air warriors at Air Force Station Bagdogra, West Bengal, on 7 November 2026. He said all Agniveers can become regular soldiers after an extra two-year tenure, if they are willing and meet the selection criteria. The Chief of Defence Staff had announced the change three days earlier, on Wednesday (4 November). The Cabinet, under Prime Minister Narendra Modi, took the decision.
Current Context (The Trigger)
- Extension announced: Agniveers who would have left the military after four years will now get an additional two-year extension. Permanent recruitment follows, subject to specific eligibility criteria.
- Who announced it: Chief of Defence Staff General N S Raja Subramani announced the change on Wednesday. The Union Cabinet, under Prime Minister Narendra Modi, took the decision.
- Timing: The announcement came just over three weeks before about 18,300 Agniveers were set to leave service at the end of their four-year term.
- Defence Minister’s words: Rajnath Singh described the move as a “significant Diwali gift for Agniveers”. He said it gives them another chance to serve the nation.
- Current strength: Over 3,00,000 soldiers recruited under Agnipath are serving in the military at present.
- CDS view: General Subramani said the decision opens a “pathway” for all Agniveers. He said almost all of them will now be taken into the defence forces.
Core Concepts & Static GK
- Agnipath launch: The Union Cabinet approved the Agnipath scheme on 14 June 2022. Youth selected under it are called Agniveers.
- Tenure: Agniveers were to be enrolled under the respective Service Acts for four years. They form a distinct rank, different from every other rank in the armed forces.
- Age limit: The eligible age at launch was 17.5 to 21 years. Enrolment is on an “All India All Class” basis.
- 25% retention: After four years, up to 25% of each batch of Agniveers could be enrolled in the regular cadre. Selection is central and based on objective criteria, including performance during the four years.
- Further service: Those taken into the regular cadre serve for a minimum of a further 15 years. This is under the existing terms for Junior Commissioned Officers and Other Ranks.
- Seva Nidhi: This is the one-time exit package. It combines the Agniveer’s own contribution with interest and an equal matching contribution from the Government. The launch release put it at about Rs 11.71 lakh.
Constitutional & Legal Framework
- Article 33: Parliament may by law decide how far the Part III Fundamental Rights apply to members of the Armed Forces. The aim is to ensure the proper discharge of their duties and the maintenance of discipline.
- Union List, Entry 2: “Naval, military and air forces; any other armed forces of the Union” is a Union subject in the Seventh Schedule. Entry 1 covers the defence of India.
- Service Acts: Agniveers are enrolled under the respective Service Acts of the three services, not under a separate new law.
- Supreme command: Article 53(2) vests the supreme command of the Defence Forces of the Union in the President.
Institutional Machinery
- Cabinet: The Union Cabinet approved both the original scheme in 2022 and, as reported, the 2026 extension.
- Chief of Defence Staff: General N S Raja Subramani announced the 2026 change.
- Three services: The Army, Navy and Air Force run recruitment through a central online system for Agniveers.
Schemes & Initiatives
- Corpus fund: Each Agniveer contributes 30% of the monthly package to the corpus fund, and the Government matches it. The launch table showed Rs 5.02 lakh from each side.
- Insurance: Agniveers got non-contributory life insurance cover of Rs 48 lakh for their period of engagement.
- CAPF and Assam Rifles quota: The Ministry of Home Affairs gave in-principle approval for 10% of vacancies for ex-Agniveers. These are the posts of Constable (General Duty) or Rifleman in the Central Armed Police Forces and Assam Rifles. Relaxation in upper age limit and exemption from the Physical Efficiency Test were also promised.
Prelims Trap Zones (Watch out for)
- Tenure Trap: The original term under Agnipath is four years. The two-year extension came only in November 2026, so a statement that the scheme began with a six-year term is wrong.
- Retention Trap: The 2022 rule was “up to 25%” of each batch moving to the regular cadre after four years. The 2026 change adds an extension and later permanent recruitment, and no new percentage has been reported.
- Pension Trap: The launch rules said Seva Nidhi is exempt from Income Tax. They also said there is no entitlement to gratuity and pension for the four-year engagement.
- Date Trap: The Cabinet approved Agnipath on 14 June 2022. The 2026 change was announced on Wednesday, 4 November, and Rajnath Singh spoke on Saturday, 7 November.
- Article Trap: Article 33 deals with the armed forces and Fundamental Rights. Article 34 deals with restriction on rights while martial law is in force.
Introduction
Under the Agnipath scheme launched in June 2022, soldiers are recruited for four years. Only up to a quarter of each batch was meant to stay on. On 4 November 2026 the Government added a two-year extension and a route to permanent recruitment, just weeks before about 18,300 Agniveers were to leave. The move tests how India balances a young armed force against the career security of its soldiers.
Key Features of the Scheme and the Change
- Short engagement: Agniveers were enrolled under the Service Acts for four years as a distinct rank.
- Youthful force: The 2022 release expected the average age of the armed forces to fall by about 4-5 years.
- Entry rules: The age band was 17.5 to 21 years. The education level stayed as for existing categories, for example Class 10 for a General Duty soldier.
- Exit package: Seva Nidhi was about Rs 11.71 lakh, tax free, with no gratuity or pension.
- New extension: Agniveers get an extra two years and then become eligible for regular enrolment if they are willing and meet the criteria.
Importance and Rationale
- Soldier welfare: Rajnath Singh called the step a “significant Diwali gift for Agniveers”. He tied it to the care of soldiers and their families, which he described as a government commitment.
- Retaining training: The CDS expects almost all Agniveers to be taken in, so the forces keep soldiers they have already trained for four years.
- Answering critics: Opposition parties, including the Congress, had asked what happens to the 75% not retained after four years.
- Scale of the cohort: About 18,300 were to exit now, and over 3,00,000 are serving, so the first decision sets a precedent for later batches.
- Link to the 15-year term: Those retained serve for 15 years, which gives the forces a stable core.
Challenges
- Unclear selection criteria: Permanent recruitment depends on “specific eligibility criteria”, but these have not been made public yet. Fairness will depend on how those rules are written and applied.
- Younger profile at risk: The scheme aimed to lower the average age by 4-5 years. A longer tenure with permanent absorption of almost all could reduce that gain.
- Fiscal burden: The 2022 rules gave no gratuity or pension for the four-year engagement. Taking almost all Agniveers into regular service will add to long-term salary and pension costs.
- Equity inside units: Batches that left or were retained under earlier rules may feel treated differently from those who benefit now.
- Political debate: Several opposition parties, including the Congress, have attacked the scheme. The change may not end the wider argument over short-term military service.
- Planning for exits: Even with the extension, some Agniveers may not be absorbed, so the CAPF and Assam Rifles quota and civil placement remain important.
Way Ahead
- Publish criteria: The Ministry of Defence should issue clear, public selection rules for permanent recruitment so that every Agniveer knows what counts.
- Protect age profile: The three services should plan intake so that the force stays young, as the 2022 scheme intended.
- Use the CAPF quota: The Ministry of Home Affairs should make sure the 10% reservation in the CAPFs and Assam Rifles works smoothly for those who exit. This includes the age relaxation and the exemption from the Physical Efficiency Test.
- Skill certificates: The skill certificate given to each Agniveer should be linked to civil jobs and training, so that those who leave are employable.
- Review after a full cycle: The Government can evaluate outcomes after the first extended batch completes its term, using data on retention, cost and morale.
Conclusion
The extension eases the immediate worry of 18,300 Agniveers about to leave, and it answers a long-standing criticism of the four-year model. Its success will depend on transparent selection, affordability and the force staying young.
News in Short
- Aeschynanthus basarensis: Scientists of the Botanical Survey of India (BSI) have described this new epiphytic (grows on tree bark) flowering plant of the Gesneriaceae family. It was found at a conservation site in Soi village, Leparada district, Arunachal Pradesh. It is named after Basar, the birthplace of co-author Egam Basar. Researchers have provisionally assessed it as ‘Critically Endangered’ under the IUCN Red List Categories and Criteria. Only about 20-25 mature plants are known from two localities.
- Black softshell turtle (Nilssonia nigricans): On 7 November 2026, 240 hatchlings of this turtle, locally called ‘Bormuria Kaso’, were released at Roumari Beel. This is a protected water body under the Biswanath Wildlife Division. The eggs came from the Nagsankar Temple pond and were hatched artificially at Biswanath Ghat. Wildlife Survival Alliance Foundation India (WSAFI) runs the work with the Forest Department and has released over 1,000 hatchlings since 2021.
- Electric locomotive on the Delhi-Agartala Rajdhani: The Tejas Rajdhani Express from New Delhi to Agartala ran with an electric locomotive for the first time. It replaced the diesel engine. It was seen at Dharmanagar station, known as the gateway to Tripura. The switch became possible after electrification of the Agartala-Lumding and Guwahati sections was completed.
- Draft Priority Sector Lending Directions, 2026: The Reserve Bank of India (RBI) has proposed tighter checks on gold-backed farm loans. Banks would keep records of land location and crops grown, and make field visits on end use. A farm loan will not lose priority sector status just because gold jewellery is the collateral. Bills discounted under letters of credit are to stay inside ‘bank credit in India’. This applies when banks work out net bank credit (NBC) and adjusted net bank credit (ANBC). Comments are open till 26 November.
- Capital Gains Accounts Scheme (CGAS), 1988: HDFC Bank has received Government authorisation to accept deposits under this scheme. CGAS lets a taxpayer who has not finished reinvesting capital gains before the income tax return deadline park the money in a special bank account. The taxpayer can then keep the tax exemption and also earn interest. HDFC will offer savings and fixed deposit accounts at its urban and semi-urban branches, not rural ones.
- Pragjyotish Nandini Aai Rukmini: The Srimanta Sankaradeva Kalakshetra Society has launched this academic initiative. It looks at the ancient cultural links between Pragjyotishpur (Assam) and Dwarka (Gujarat) through the Krishna-Rukmini stories. A three-day national seminar will be held at Kalakshetra, Guwahati, from 12 to 14 November. Heritage sites such as Malinithan, Bhismaknagar and Sadiya will be discussed.
- Barak Valley High Court bench demand: The High Court Bench Demand Implementation Committee sent a fresh memorandum to the Chief Justice of the Gauhati High Court. It was sent through the Cachar District Commissioner. It asks for a permanent bench in Barak Valley. The proposal is expected before the High Court’s Administrative Committee on 11 November. The memorandum points to the recent permanent bench of the High Court of Jammu and Kashmir and Ladakh at Leh.
- Tengakhat tank farm explosion: The death toll from the 6 November explosion rose to three on 7 November. The blast was at Oil India Limited’s (OIL) Intermediate Tank Farm at Tengakhat, Dibrugarh district. Maintenance work was going on when the blast and fire took place. OIL has announced ex gratia of Rs 10 lakh for the kin of each person who died and Rs 5 lakh for each injured person.
APSC Prelims MCQs
Practice questions on the topics above
Topic 1: Amur Falcon Roost at Dharamtul and Industrial Siting
Q1. The Amur falcon, a long-distance migrant, stops over in North-East India each autumn. Consider the following statements:
(i) It breeds in south-eastern Siberia, Mongolia and northern China and winters in southern Africa.
(ii) It is listed in Appendix II of the Convention on Migratory Species.
(iii) It is classified as Endangered by the IUCN.
Which of the statements given above is/are correct?
- (a) (i) and (ii) only
- (b) (ii) and (iii) only
- (c) (i) and (iii) only
- (d) (i), (ii) and (iii)
Show answer
Answer: (a) Explanation: Statements (i) and (ii) are correct. The falcon breeds in south-eastern Siberia, Mongolia and northern China and spends the winter on southern African grasslands. The Convention on Migratory Species has listed it in Appendix II since 1979. Statement (iii) is wrong because the IUCN rates the species Least Concern, not Endangered, owing to its wide range and large population. Options (b), (c) and (d) all wrongly include statement (iii). Value addition: the Gangetic river dolphin was recently confirmed in the Kopili. It is Endangered on the IUCN list and is in Schedule I of the Wild Life (Protection) Act, 1972. It was declared India’s National Aquatic Animal on 5 October 2009.
Q2. Under the EIA Notification, 2006, consider the following statements:
(i) Public consultation is required for Category A and Category B1 projects, except for a few exempted activities.
(ii) Category B2 projects do not need an EIA report.
(iii) Category A projects are appraised by the State Level Expert Appraisal Committee.
Which of the statements given above is/are correct?
- (a) (i) and (ii) only
- (b) (ii) and (iii) only
- (c) (i) and (iii) only
- (d) (i), (ii) and (iii)
Show answer
Answer: (a) Explanation: Statements (i) and (ii) are correct. The Notification requires public consultation for Category A and B1 projects. It ordinarily has two parts, a public hearing and written responses, and six listed activities are exempted. The State Expert Appraisal Committee sorts Category B projects into B1, which need an EIA, and B2, which do not. Statement (iii) is wrong because Category A projects are cleared by the Central Government on the advice of the central Expert Appraisal Committee. The State committee handles only Category B. Value addition: the Member-Secretary of the State Pollution Control Board fixes the date of the public hearing within 7 days of receiving the draft EIA.
Q3. Match List-I (Place) with List-II (District/State):
| List-I (Place) | List-II (District/State) |
|---|---|
| a. Doyang reservoir (Pangti) | 1. Dima Hasao, Assam |
| b. Umrangso | 2. Nagaland |
| c. Dharamtul | 3. Morigaon, Assam |
| d. Habang | 4. West Karbi Anglong, Assam |
Select the correct answer using the codes given below:
- (a) a-2, b-1, c-3, d-4
- (b) a-2, b-4, c-3, d-1
- (c) a-1, b-2, c-4, d-3
- (d) a-3, b-1, c-2, d-4
Show answer
Answer: (a) Explanation: The correct pairing is a-2, b-1, c-3, d-4. The Doyang reservoir, beside Pangti village, is in Nagaland, and Umrangso is in Assam’s Dima Hasao district. Dharamtul lies near Jagiroad in Morigaon district. Habang, where the falcons stopped returning after disturbance grew, is in West Karbi Anglong. Option (b) wrongly places Umrangso in West Karbi Anglong and Habang in Dima Hasao. Option (c) puts Doyang in Assam and Dharamtul in West Karbi Anglong. Option (d) places Dharamtul in Nagaland. Value addition: in August 2013, village councils around Doyang held consultations with Pangti, Ashaa and Sungro. They then declared Amur falcon hunting illegal, with a fine of Rs 5,000.
Q4. Under which provision of the Wild Life (Protection) Act, 1972 can a State Government declare private or community land as a community reserve?
- (a) Section 18
- (b) Section 35
- (c) Section 36A
- (d) Section 36C
Show answer
Answer: (d) Explanation: Section 36C lets the State Government declare private or community land as a community reserve. This applies where a community or an individual has volunteered to conserve wildlife. The land must not already be part of a national park, sanctuary or conservation reserve. Section 18 deals with the declaration of sanctuaries and Section 35 with national parks, which are separate protected areas. Section 36A covers conservation reserves, a different category from community reserves. Value addition: after notification, the land-use pattern of a community reserve cannot change. This needs a resolution of its management committee (Section 36D) and State Government approval.
Topic 2: Riverbank Erosion Displaces Villages in Darrang
Q5. The Flood Management and Border Areas Programme (FMBAP) was approved by the Cabinet for 2021-26. Consider the following statements:
(i) The total outlay of the programme is Rs 4,100 crore.
(ii) Under the Flood Management Programme component, the North-Eastern states receive 90 per cent central assistance.
(iii) The Flood Management Programme component has an outlay of Rs 1,160 crore.
Which of the statements given above is/are correct?
- (a) (i) and (ii) only
- (b) (ii) and (iii) only
- (c) (i) and (iii) only
- (d) (i), (ii) and (iii)
Show answer
Answer: (a) Explanation: Statements (i) and (ii) are correct. On 21 February 2024 the Union Cabinet approved FMBAP for 2021-26 with a total outlay of Rs 4,100 crore. Under its Flood Management Programme, special category states, including the North-Eastern states, get 90 per cent central and 10 per cent state funding. Statement (iii) is wrong. Rs 1,160 crore is the outlay of the River Management and Border Areas component. The Flood Management Programme has Rs 2,940 crore. Options (b), (c) and (d) all include the wrong statement (iii). Value addition: general category states get 60:40 funding under the Flood Management Programme. Border-river works under the River Management and Border Areas component get 100 per cent central assistance.
Q6. Match List-I with List-II:
| List-I | List-II |
|---|---|
| a. Brahmaputra Board | 1. Statutory body under an Act of 1980 that prepares master plans |
| b. River Management and Border Areas component | 2. Funded with 100 per cent central assistance |
| c. Flood Management Programme (North-Eastern states) | 3. 90:10 Centre-State funding |
| d. State-specific disaster (erosion in Assam) | 4. Up to 10 per cent of SDRF funds may be used |
Select the correct answer using the codes given below:
- (a) a-2, b-1, c-3, d-4
- (b) a-1, b-3, c-2, d-4
- (c) a-1, b-2, c-3, d-4
- (d) a-1, b-2, c-4, d-3
Show answer
Answer: (c) Explanation: The Brahmaputra Board was set up under the Brahmaputra Board Act, 1980. Its job is to prepare master plans for flood control, bank erosion and drainage, so a matches 1. The River Management and Border Areas component gets 100 per cent central assistance, so b matches 2. Under the Flood Management Programme, North-Eastern states share costs 90:10, so c matches 3. A state may use up to 10 per cent of its SDRF funds for locally notified disasters. Erosion in Assam is one such case, so d matches 4. Options (a), (b) and (d) swap two of these pairs. Value addition: the Brahmaputra Board works under the Ministry of Jal Shakti and has its headquarters in Guwahati.
Q7. Which of the following statements about erosion in Assam is NOT correct?
- (a) The Brahmaputra Board Act was passed in 1980 for flood and bank-erosion control in the Brahmaputra Valley.
- (b) Assam has notified erosion as a state-specific disaster.
- (c) A study cited by the Water Resources Department puts the area eroded since 1950 at about 4.27 lakh hectares.
- (d) Assam can spend its entire State Disaster Response Fund on state-specific disasters such as erosion.
Show answer
Answer: (d) Explanation: Statement (d) is not correct. Under the SDRF norms, a state may use only up to 10 per cent of its SDRF funds for state-specific disasters. So Assam cannot spend the whole fund on erosion. This limit is one reason Assam has long asked for erosion to be added to the NDRF/SDRF list. Statement (a) is correct because the Act received assent on 1 September 1980. Statement (b) is correct because Assam did notify erosion as a state-specific disaster. Statement (c) is correct because the figure is about 4.27 lakh hectares since 1950, or 7.40 per cent of the state. Value addition: the 15th Finance Commission kept Rs 1,000 crore in the NDRF for resettling erosion-displaced people in 2021-26.
Q8. According to a study cited by the Assam Water Resources Department, the average annual area eroded by rivers in the state is about:
- (a) 800 hectares
- (b) 8,000 hectares
- (c) 80,000 hectares
- (d) 4.27 lakh hectares
Show answer
Answer: (b) Explanation: The Water Resources Department cites an average annual erosion of about 8,000 hectares. Option (a) understates it ten times, and option (c) overstates it ten times, which are typical zero-shifting traps. Option (d), 4.27 lakh hectares, is the total area eroded since 1950 and not the yearly rate. That total equals about 7.40 per cent of Assam’s area, built up by roughly 8,000 hectares a year over seven decades. Value addition: for 2021-26, the 15th Finance Commission recommended Rs 1,500 crore from the National Disaster Mitigation Fund for erosion mitigation. It added Rs 1,000 crore from the NDRF for resettlement.
Topic 3: E20 Ethanol-Blended Petrol Quality Row
Q9. The Petroleum Ministry says tests of E20 petrol samples found them compliant, while Karnataka’s consumer department has claimed higher ethanol content at some outlets. Consider the following statements:
(i) The ministry said all 893 samples tested across 27 states and Union Territories had ethanol within the 19-21 per cent range under IS 17021.
(ii) Karnataka’s Department of Food, Civil Supplies, Consumer Affairs and Legal Metrology claimed that some samples contained 26-31 per cent ethanol.
(iii) During an inspection under the 2005 Order read with MDG 2024, four of the six one-litre samples are sent to an authorised laboratory.
Which of the statements given above is/are correct?
- (a) (i) and (ii) only
- (b) (ii) and (iii) only
- (c) (i) only
- (d) (i), (ii) and (iii)
Show answer
Answer: (a) Explanation: Statements (i) and (ii) match what the paper reported. The ministry cited 893 samples in the 19-21 per cent range. The Karnataka department claimed 26-31 per cent. Statement (iii) is wrong because only two of the six samples go to an authorised laboratory. The dealer gets two, and the oil company or the inspecting department keeps two. So options (b), (c) and (d) fail. Value addition: the Karnataka figure is a contested claim, and the three oil companies have questioned its sampling and testing procedure.
Q10. Arrange the following events in the correct chronological order:
A. National Policy on Biofuels is notified, widening raw materials beyond sugarcane
B. NITI Aayog releases a roadmap for moving from E10 to E20
C. Union Cabinet approves amendments advancing the 20 per cent target to ESY 2025-26
D. India meets its E10 target
- (a) A-C-B-D
- (b) B-A-C-D
- (c) A-B-C-D
- (d) A-B-D-C
Show answer
Answer: (c) Explanation: The National Policy on Biofuels came in May 2018 and widened feedstocks beyond sugarcane. NITI Aayog released its roadmap in June 2021. The Cabinet approved the amendment advancing E20 from 2030 to ESY 2025-26 on 18 May 2022. India met the E10 target in June 2022, five months ahead of schedule. So the order is A, B, C, D. Option (d) swaps C and D, which is the usual trap because both fall in 2022. Options (a) and (b) place the policy after the roadmap or the amendment. Value addition: the 2018 policy had set the E20 date as 2030.
Q11. The bamboo-based second-generation bio-refinery at Numaligarh in Golaghat district, Assam, received central financial support under which scheme?
- (a) PM-KUSUM
- (b) Pradhan Mantri JI-VAN Yojana
- (c) GOBAR-Dhan
- (d) PM Surya Ghar Muft Bijli Yojana
Show answer
Answer: (b) Explanation: Official records show that a second-generation bamboo-based biorefinery has been set up at Numaligarh, Assam, with support under the Pradhan Mantri JI-VAN Yojana. Numaligarh Refinery Limited runs it through its joint venture, Assam Bio-Ethanol Private Limited. The scheme was approved in 2019 to fund 2G ethanol projects. PM-KUSUM supports solar pumps for farmers. GOBAR-Dhan turns cattle dung and organic waste into biogas. PM Surya Ghar gives rooftop solar to households. So (a), (c) and (d) are wrong. Value addition: the original JI-VAN outlay was Rs 1,969.50 crore, and a 2024 amendment extended the scheme to 2028-29.
Q12. According to the Government’s FAQ on the Ethanol Blended Petrol Programme (10 July 2026), what was the average ethanol blending achieved in Ethanol Supply Year 2024-25?
- (a) 10.0 per cent
- (b) 12.1 per cent
- (c) 14.6 per cent
- (d) 19.2 per cent
Show answer
Answer: (d) Explanation: The FAQ lists blending of 19.2 per cent for ESY 2024-25. It lists 20 per cent for ESY 2025-26, from November to June. The other options are earlier years in the same table. Option (a), 10.0 per cent, is ESY 2021-22. Option (b), 12.1 per cent, is ESY 2022-23. Option (c), 14.6 per cent, is ESY 2023-24. Students often pick a mid-table figure by mistake, so learn the year with the number. Value addition: the 2022 Cabinet amendment had set ESY 2025-26 as the target year for 20 per cent blending.
Topic 4: Agnipath Scheme and Agniveer Tenure Extension
Q13. The Union Government recently announced a two-year extension for Agniveers. Consider the following statements about the Agnipath scheme:
(i) The Union Cabinet approved the scheme on 14 June 2022.
(ii) The eligible age for Agniveers at launch was 17.5 to 21 years.
(iii) Agniveers who leave after four years are entitled to a regular pension.
Which of the statements given above is/are correct?
- (a) (i) and (ii) only
- (b) (ii) and (iii) only
- (c) (i) only
- (d) (i), (ii) and (iii)
Show answer
Answer: (a) Explanation: Statements (i) and (ii) are correct. The Cabinet cleared Agnipath on 14 June 2022, and the launch release fixed the eligible age at 17.5 to 21 years. Statement (iii) is wrong because the launch rules gave a one-time Seva Nidhi package of about Rs 11.71 lakh. They stated that there is no entitlement to gratuity and pensionary benefits. So options (b), (c) and (d) fail. Option (c) leaves out the age rule, and (b) and (d) include the false pension claim. Value addition: Seva Nidhi is exempt from Income Tax, and the Government’s matching contribution equals the Agniveer’s own contribution with interest.
Q14. Under which Article of the Constitution can Parliament by law restrict or abrogate Fundamental Rights in their application to members of the Armed Forces?
- (a) Article 32
- (b) Article 33
- (c) Article 34
- (d) Article 53
Show answer
Answer: (b) Explanation: Article 33 allows Parliament to decide, by law, how far the rights in Part III apply to members of the Armed Forces and certain other forces. The aim is that they can discharge their duties properly and keep discipline. Article 32 is the right to move the Supreme Court for enforcing Fundamental Rights, so it is not the answer. Article 34 deals with restriction on rights while martial law is in force in an area, which is a different situation. Article 53 vests the executive power of the Union in the President. It also vests the supreme command of the Defence Forces. But it does not restrict rights. Value addition: Agniveers are enrolled under the respective Service Acts, which are laws made by Parliament.
Q15. In the Seventh Schedule, the subject “Naval, military and air forces; any other armed forces of the Union” is found in which place?
- (a) Union List, Entry 1
- (b) State List, Entry 2
- (c) Union List, Entry 2
- (d) Concurrent List, Entry 2
Show answer
Answer: (c) Explanation: Entry 2 of the Union List covers naval, military and air forces and any other armed forces of the Union. Only Parliament can legislate on it, which is why a recruitment model such as Agnipath is decided by the Centre and not the States. Option (a) is wrong because Entry 1 of the Union List covers the defence of India and preparation for defence. Options (b) and (d) are wrong because the armed forces are not a State or Concurrent subject. Value addition: Article 246 distributes legislative powers using the Seventh Schedule, with Parliament having exclusive power over Union List matters.
Q16. Which of the following statements about the Agnipath scheme and the related measures of 2022 is NOT correct?
- (a) Agniveers are enrolled under the respective Service Acts for four years.
- (b) Up to 25% of each batch could be enrolled in the regular cadre after four years.
- (c) The Seva Nidhi package is fully funded by the Government, with no contribution from the Agniveer.
- (d) The Ministry of Home Affairs gave in-principle approval for 10% of vacancies for ex-Agniveers in CAPF and Assam Rifles constable or rifleman posts.
Show answer
Answer: (c) Explanation: Statement (c) is not correct. Seva Nidhi has two parts: the Agniveer’s own contribution (30% of the monthly package) with interest, and an equal matching contribution from the Government. The launch table showed Rs 5.02 lakh from each side. Statement (a) is correct since enrolment is under the Service Acts for four years. Statement (b) is correct because the Cabinet release allowed up to 25% of each batch in the regular cadre. Statement (d) is correct, as the Ministry of Home Affairs told the Rajya Sabha on 20 July 2022. Value addition: those taken into the regular cadre serve for a minimum further 15 years.
Mains Answer Writing
One exam-style question with a model answer
Q. Migratory birds such as the Amur falcon often rest on wetlands that have no legal protection. Critically examine the gaps in India’s Environmental Impact Assessment (EIA) process in safeguarding such habitats. Suggest measures to reconcile industrial development with habitat protection in Assam. (250 words, 15 marks)
Model answer
Introduction: Nearly all the world’s Amur falcons are thought to stop over in North-East India each autumn. Yet many draft Environmental Impact Assessment (EIA) reports for industries near the unprotected Dharamtul wetlands of Morigaon do not mention the falcon at all.
1. India’s EIA process: the safeguards it offers on paper
- Prior clearance by law: The EIA Notification, 2006 makes prior environmental clearance compulsory for listed projects. The Centre clears Category A projects and the state authority clears Category B.
- Clear stages: A project goes through screening (for Category B only), scoping, public consultation and appraisal.
- Public hearing: The District Magistrate, or an officer not below Additional District Magistrate, presides over the hearing with the State Pollution Control Board. At least 30 days’ newspaper notice is required.
- Expert appraisal: Central and state Expert Appraisal Committees study the report and recommend clearance with conditions or rejection.
2. Gaps in the EIA process in safeguarding such habitats
- Species left out: Many draft EIAs near Dharamtul do not count the falcons at all. Some also ignore elephants from the Amsoi and Kholahat Reserve Forests and the Gangetic river dolphins of the Kopili.
- Unprotected wetlands fall outside the net: The Wetlands (Conservation and Management) Rules, 2017 apply only to Ramsar sites and notified wetlands. Dharamtul is neither, so no rule makes an EIA treat it as sensitive.
- Short baseline studies: Terms of Reference for EIAs usually ask for field data from just one season, other than the monsoon. The falcons stay at Dharamtul only about 15 to 20 days, mostly in November, so a survey at another time can miss them.
- Conflict of interest: The project proponent hires and pays the EIA consultant. Accreditation by the Quality Council of India’s National Accreditation Board for Education and Training (QCI-NABET) has not fully removed this worry.
- Token hearings: Villagers near Dharamtul allege that they were kept out and not allowed to speak. The Draft EIA Notification, 2020 had even proposed cutting the notice from 30 to 20 days.
- Piecemeal and after-the-fact approvals: Projects are appraised one at a time, though Morigaon already has a cement plant near Jagiroad. On 18 November 2025, the Supreme Court, by a 2:1 majority, recalled its May 2025 Vanashakti judgment that had barred post-facto (after-the-event) clearances.
3. Way Forward: measures to reconcile industrial development with habitat protection in Assam
- Independent ecological study: The appraising authority, such as the State Environment Impact Assessment Authority (SEIAA), Assam, should demand an independent study covering November. It must assess the falcons, elephants and dolphins before any decision.
- Notify the wetland: The Assam State Wetlands Authority, notified in November 2018, should notify Dharamtul under the 2017 Rules. New or expanded industries and land conversion would then be barred inside it.
- Community reserve: Under Section 36C of the Wild Life (Protection) Act, 1972, the state can declare community land a community reserve. This happens when villagers volunteer to protect wildlife. Any change in land use there then needs the management committee’s resolution and State Government approval.
- Buffer and bird-safe rules: No unit should draw groundwater or release effluent that harms the wetland. A buffer should keep heavy work away during falcon season, and power lines should be made safer against collision and electrocution.
- Learn from Pangti: Mass falcon killing in Nagaland came to light in 2012. Village councils, eco-clubs, the state government and Wildlife Trust of India made Pangti a safe haven by 2013. A similar village-led model can work in Morigaon.
- Flyway commitments: The Amur falcon is listed in Appendix II of the Convention on Migratory Species (CMS). India’s next Central Asian Flyway action plan for migratory birds, after the 2018-2023 plan, should list plains stopovers like Dharamtul.
Conclusion: On balance, India’s EIA process is sound on paper but weak in the field, because it counts only what lies inside protected boundaries. Assam does not have to choose between factories and falcons: notified wetlands, honest field studies and a real voice for villagers can keep both.
Prepare with SuchitraACS
APSC CCE Foundation Programme₹24,999
APSC Prelims Crash Course 2027 (GS + CSAT)₹5,999
APSC CCE Study Materials Package (Prelims + Mains)₹4,999 


