EIA public hearing in Dimoria Assam: APSC Current Affairs Notes and MCQs

By Amit BiswakarmaPublished 15 min read
Part of the daily current affairs of 11 November 2026:All notes of the day →All MCQs of the day →Mains answer writing →

APSC CCE current affairs notes on EIA public hearing in Dimoria Assam, from The Assam Tribune of 11 November 2026, with 4 practice MCQs for Prelims.

APSC CCE Foundation ProgrammeFor working professionals and full-time aspirantsAPSC CCE Foundation Programme₹24,999 ₹44,999 44% offView course

Current Affairs Notes

From The Assam Tribune, 11 November 2026

Public Hearing and Environmental Clearance for Dimoria Chemical Complex

Syllabus Mapping

  • Prelims: GS Paper I (General issues on Environment, ecology and climate change; Current events of State/National importance).
  • Mains: GS Paper III (Environmental impact assessment; conservation and pollution; industrial development); GS Paper V (Assam: environment and economy of the State; issues of local governance and people’s participation).

Why in News? Several student unions and other organisations of the Dimoria area have sent a memorandum to the Pollution Control Board. This was reported from Jorabat on 10 November 2026. They want the 30 October public hearing on the proposed Rs 453-crore chemical manufacturing project at Topatoli declared defective.

Prelims Perspective

Current Context (The Trigger)

  • The hearing: The public hearing on the proposed project was held on 30 October 2026 at Ganamancha, Topatoli, from 11.30 am onwards. The Assam Pollution Control Board (APCB) notification fixed the venue and time.
  • The objectors: The All Koch-Rajbongshi Students’ Union, the Amri Karbi Students’ Union and the All Tiwa Students’ Union, among others, sent the memorandum. It went to the Pollution Control Board through the Dimoria Co-District Commissioner.
  • The main allegation: The hearing notice did appear in newspapers. The organisations say the news did not spread well at the village level, so many people nearby never knew about the hearing. Reports describe the hearing hall as having rows of empty chairs.
  • The demand: The organisations want an independent scientific study of the affected villages before the project is taken up for environmental clearance. It should cover water quality, soil contamination, farm output and fish production.
  • The project: M/s Progressive Innochem LLP, a unit of M/s Progressive Fertichem Pvt Ltd, plans a chemical complex on 6.23 hectares at Topatoli. The site lies along National Highway 27 (NH-27), earlier numbered NH-37.
  • Products and power: The plan covers caustic soda, chlorinated paraffin wax, chlorinated polyethylene, poly aluminium chloride, bleaching powder and ferric chloride. It also includes a 25-MW captive power plant.
  • Water and waste: The project’s Executive Summary puts fresh water need at 2,465 kilolitres per day (KLD) and total water need at 3,833 KLD. The company proposes a Zero Liquid Discharge system for its industrial wastewater. It also expects 160 tonnes per day of liquid chlorine as a by-product.

Core Concepts & Static GK

  • Environmental Impact Assessment (EIA): It is a study, done before a project starts, of how the project will affect air, water, land and people. The EIA Notification, 2006 (S.O. 1533, dated 14 September 2006) requires prior environmental clearance for projects listed in its Schedule. It replaced the earlier notification of 27 January 1994.
  • Category A and Category B: Category A projects need clearance from the Central Government in the Environment Ministry. Category B projects need clearance from the State Environment Impact Assessment Authority (SEIAA).
  • Expert bodies: The Expert Appraisal Committee (EAC) at the Centre examines Category A projects. The State Level Expert Appraisal Committee (SEAC) examines Category B projects.
  • B1 and B2: At screening, the SEAC sorts Category B projects into B1 and B2. B1 projects need an EIA report, while B2 projects do not.
  • Four stages: The clearance process has up to four stages in order: screening, scoping, public consultation and appraisal. The Notification says screening applies only to Category B projects.
  • Scoping: The expert committee fixes the Terms of Reference (ToR) for the EIA study. It must convey them within 60 days of receiving Form 1. If it misses this deadline, the ToR suggested by the applicant are treated as final.
  • Public consultation: It ordinarily has two parts. One is a public hearing at or near the site for local affected people. The other is written responses from other people with a plausible stake.
  • Who needs it: All Category A and Category B1 projects must hold public consultation. The Notification lists exemptions, such as all B2 projects and units inside approved industrial estates.

Constitutional & Legal Framework

  • Environment (Protection) Act, 1986: It is Act No. 29 of 1986, dated 23 May 1986. It came into force across India on 19 November 1986.
  • Stockholm link: The preamble recalls the United Nations Conference on the Human Environment held at Stockholm in June 1972, in which India took part.
  • Section 3: It gives the Central Government power to take all measures it thinks necessary to protect and improve the environment. This includes preventing, controlling and reducing pollution.
  • Section 5: It lets the Central Government issue written directions to any person, officer or authority. That person or authority must obey them.
  • EIA Notification, 2006: The Centre issued it under Section 3 of the 1986 Act, read with the Environment (Protection) Rules, 1986. It is the rulebook for environmental clearance of listed projects.
  • National Green Tribunal Act, 2010: The National Green Tribunal (NGT) was set up under this Act on 18 October 2010. Under Section 16, any person aggrieved by an order granting environmental clearance can appeal to it within 30 days of the order being communicated.

Institutional Machinery

  • State Pollution Control Board: Under the 2006 Notification, the State Pollution Control Board (SPCB) conducts the public hearing. It must send the proceedings to the regulatory authority within 8 days of completing the hearing.
  • Presiding officer: Appendix IV says the District Magistrate supervises and presides over the hearing. A representative not below the rank of Additional District Magistrate (ADM) can do this instead. A representative of the SPCB assists.
  • Assam practice: The Assam Pollution Control Board website says the hearing panel has the Deputy Commissioner or a nominee and a Board representative. The Board representative comes from its head office or the regional office concerned.
  • Fixing the date: The SPCB Member-Secretary must fix the date, time and venue within 7 days of receiving the draft EIA report. The notice goes in one major national daily and one regional vernacular daily.
  • PARIVESH: It is the Environment Ministry’s single-window portal for environment, forest, wildlife and Coastal Regulation Zone clearances. It was launched at the central level on 10 August 2018 and rolled out to the States on 16 August 2019.
  • Appeal forum: The NGT’s principal bench sits in New Delhi, with zonal benches at Bhopal, Pune, Kolkata and Chennai. Cases from Assam are heard by the Eastern Zone Bench at Kolkata.

Assam & Northeast Linkages

  • Who presided: Dimoria Co-District Commissioner Kankan Sarmah of the Assam Civil Service presided over the 30 October hearing. Appendix IV requires the presiding officer to be the District Magistrate or an officer not below ADM rank.
  • Record-keeping: The APCB notification required a certified register, an attendance register and a video recording. The agenda began with a company presentation, followed by views from the public, non-governmental organisations and others with a stake.
  • Notice norms in Assam: The Board publishes the public notice in at least two daily newspapers. One of them must be in the local language.
  • Where documents are kept: In Assam, the draft EIA report and its summary are kept at several offices. These include the Deputy Commissioner’s office, the District Industries Centre and the Zilla Parishad. They are also kept at the Environment Ministry’s regional office in Shillong.
  • Livelihood concern: The organisations call Dimoria a traditionally farm-dependent area. They blame waste from existing units for poorer water quality and a fall in fish production.
  • Highway location: The site lies along NH-27, which was earlier numbered NH-37.

Prelims Trap Zones (Watch out for)

  • Category Trap: The paper says the Topatoli project falls under Category A. So the central EAC appraises it and the Environment Ministry decides, not the SEIAA or the SEAC.
  • Presiding Trap: The Pollution Control Board conducts the hearing and records it. But the District Magistrate, or an officer not below ADM rank, presides.
  • Days Trap: The public gets at least 30 days’ notice to send responses. The hearing must be completed within 45 days of the applicant’s request. Do not swap the two numbers.
  • Stage Trap: Screening (Stage 1) applies only to Category B projects. For a Category A project, the first stage that applies is scoping by the central EAC.
  • Exemption Trap: Public consultation covers Category A and B1 projects, not all Category B projects. B2 projects need no EIA report and no public hearing.
  • Place Trap: The hearing was at Ganamancha, Topatoli, in the Dimoria area. The Dimoria Co-District Commissioner presided, not the Pollution Control Board.
  • Zero Liquid Discharge Trap: Zero Liquid Discharge is only a proposal by the company at this stage. It is not a proven result.
Mains Perspective

Introduction

The 30 October public hearing at Topatoli saw rows of empty chairs, and local organisations now say it failed its purpose. Public consultation is the stage where affected people get a legal chance to speak before a Category A project reaches appraisal. For Assam, the case tests whether industrial growth and farm-based livelihoods can share the same land in Dimoria.

How Environmental Clearance Works

  • Four stages: The process runs through screening, scoping, public consultation and appraisal. Each stage adds a check before the final decision.
  • Category decides the route: Category A projects go to the central EAC, while Category B projects go to the State committee. The Topatoli project is Category A, so it follows the central route.
  • Scoping sets the study: The expert committee fixes the Terms of Reference within 60 days of Form 1. The EIA report must then follow these terms.
  • Appraisal closes the loop: The committee examines the final EIA report and the outcome of public consultation, including the hearing record. It then recommends grant or rejection, with reasons, to the regulatory authority.
  • Timelines: The regulatory authority must convey its decision within 45 days of the committee’s recommendation. In other words, it must decide within 105 days of receiving the final EIA report.
  • Link to hearing: Objections and suggestions from the consultation must be considered in the final assessment before appraisal. After the hearing, the applicant must address the concerns raised and revise the draft EIA report.

Comparative Assessment: Category A and Category B

FeatureCategory ACategory B
Expert appraisalExpert Appraisal Committee at the CentreState Level Expert Appraisal Committee
Deciding authorityCentral Government in the Environment MinistryState Environment Impact Assessment Authority
Screening stageNot applicableApplies; project is classed as B1 or B2
Public consultationRequired, with listed exemptionsRequired only for B1, with listed exemptions
EIA reportRequiredRequired for B1, not for B2

Why Public Hearing Matters

  • Local voice: The hearing lets residents raise concerns before an expert body decides. The Dimoria organisations are now using the same process to challenge the project.
  • Documented process: The rules require the SPCB to video film the entire proceedings. The 30 October notification also asked for a certified register and an attendance register.
  • Summary read aloud: The SPCB representative records a summary of views and reads it out at the end in the local language. This helps villagers confirm that their views were noted.
  • Input for appraisal: Objections and suggestions must be considered in the final assessment before appraisal. A weak hearing therefore weakens the whole file.
  • Public display: The proceedings are displayed at the Panchayat office, the Zila Parishad, the District Magistrate’s office and the SPCB. The SPCB also puts them on its website.
  • Time limit: The hearing must be completed within 45 days of the applicant’s request. If the SPCB fails, the Notification lets another agency complete the process.

Concerns in Dimoria

  • Outreach gap: A newspaper notice was published, but villagers say they did not learn of the hearing. Poor local outreach is the core of the complaint.
  • Low turnout: Empty chairs on 30 October suggest that the people the hearing was meant for did not attend. The unions use this to ask for the hearing to be declared defective.
  • Cumulative burden: The organisations say hazardous and pollution-heavy units keep coming to a farm-dependent region. They want the damage from existing units assessed first.
  • Water and fish: They allege that chemical waste from existing units has harmed water quality and nearby water bodies. They also report a fall in fish production.
  • Hazardous by-product: The proposal includes 160 tonnes per day of liquid chlorine as a by-product. This makes safe handling of hazardous chemicals and emergency planning a key issue.
  • Heavy water demand: Total water need is estimated at 3,833 KLD. In a farming area, large withdrawals can compete with irrigation and drinking water.

Challenges

  • Local-level information: The rules ask for notices in two dailies, one of them in the local language. Villages where few people read newspapers may still miss the notice, as the Dimoria case alleges.
  • Baseline data: The organisations say the present condition of water, soil and fish stock has not been independently established. Without a baseline, new impact cannot be measured fairly.
  • Cumulative impact: The organisations argue that the new plant cannot be judged in isolation from existing units. A single-project EIA finds it hard to capture this combined load.
  • Trust deficit: The unions question whether the hearing met its purpose. Distrust in the process can lead to protests and delays even after clearance.
  • Technical claims untested: Zero Liquid Discharge is a promise at this stage. Residents have no easy way to test it without independent experts.
  • Emergency readiness: A chlorine by-product of 160 tonnes per day raises the stakes of leaks or accidents. Villages near the site need clear emergency plans.

Way Ahead

  • Review of the hearing: The Pollution Control Board should examine the memorandum and check the notice, registers and video record. If lapses are found, a fresh hearing with wider notice would remove doubts.
  • Local-language outreach: The Board and the district administration should use village meetings, Gaon Panchayat offices and local-language announcements. This gives villages real notice and not only a newspaper advertisement.
  • Independent baseline study: An independent agency should study water, soil, farm output and fish production in the affected villages. The results should be made public before appraisal.
  • Cumulative assessment: The central EAC should look at the combined load of existing and proposed units in Dimoria during appraisal. This answers the unions’ central demand.
  • Safety planning: The company should publish its plan for chlorine handling and emergency response. The district administration should hold mock drills with villagers.
  • Legal recourse: Any person aggrieved by an order granting environmental clearance can appeal to the NGT within 30 days. Assam cases go to its Eastern Zone Bench at Kolkata, but clear communication early on reduces the need for such cases.

Conclusion

Public consultation is meant to give affected villagers a real say. The Dimoria dispute shows that a hearing held on paper is not enough. A fresh look at the hearing, an independent baseline study and a cumulative assessment would make any final decision fair and defensible. Industrial growth in Assam will last only if it earns the trust of the farmers and fishers who live beside it.

APSC Prelims MCQs

Practice questions on this topic

Q1. The EIA Notification, 2006 lays down the procedure for a public hearing. Consider the following statements:

(i) A minimum notice period of 30 days is given to the public for furnishing their responses.

(ii) The District Magistrate, or a representative not below the rank of Additional District Magistrate, presides over the hearing.

(iii) The public hearing must be completed within 60 days of the applicant’s request.

Which of the statements given above is/are correct?

  • (a) (i) and (ii) only
  • (b) (ii) and (iii) only
  • (c) (i) and (iii) only
  • (d) (i), (ii) and (iii)
Show answer

Answer: (a) Explanation: Statement (i) is correct because Appendix IV of the Notification gives the public at least 30 days to send their responses. Statement (ii) is correct because the District Magistrate supervises and presides over the hearing. An officer not below Additional District Magistrate rank can do this instead. A State Pollution Control Board representative assists. Statement (iii) is wrong because the hearing must be completed within 45 days of the applicant’s request, not 60 days. Sixty days is the limit for conveying the Terms of Reference, which is a different step. So options (b), (c) and (d), which include statement (iii), are wrong. Value addition: the Board must video film the entire proceedings and send the proceedings to the regulator within 8 days of the hearing.

Q2. Match List-I with List-II:

List-I (Stage)List-II (Feature)
a. Screening1. Terms of Reference set by the expert committee
b. Scoping2. Committee scrutinises the final EIA and recommends grant or rejection
c. Public consultation3. Applies only to Category B projects
d. Appraisal4. Public hearing near the site plus written responses

Select the correct answer using the codes given below:

  • (a) a-3, b-1, c-4, d-2
  • (b) a-1, b-3, c-2, d-4
  • (c) a-3, b-1, c-2, d-4
  • (d) a-2, b-4, c-1, d-3
Show answer

Answer: (a) Explanation: Screening applies only to Category B projects, where the State committee decides whether an EIA report is needed, so a matches 3. Scoping is where the expert committee sets the Terms of Reference, so b matches 1. Public consultation has a public hearing near the site and written responses, so c matches 4. Appraisal is where the committee studies the final EIA report and consultation outcome and recommends grant or rejection, so d matches 2. Option (c) swaps the consultation and appraisal features. Options (b) and (d) also put screening and scoping against the wrong descriptions. Value addition: if the Terms of Reference are not conveyed within 60 days of Form 1, the applicant’s proposed terms are treated as final.

Q3. Which of the following statements about environmental clearance under the EIA Notification, 2006 is NOT correct?

  • (a) Category A projects are appraised by the Expert Appraisal Committee at the central level.
  • (b) Category B projects are handled at the State level, where the State Environment Impact Assessment Authority takes the clearance decision.
  • (c) Category B2 projects need a full EIA report and a public hearing.
  • (d) Public consultation has a public hearing and written responses.
Show answer

Answer: (c) Explanation: Option (c) is not correct. At screening, the State Level Expert Appraisal Committee sorts Category B projects into B1, which need an EIA report, and B2, which do not. Public consultation is required only for Category A and B1 projects, and B2 projects are expressly exempt. So B2 projects need neither an EIA report nor a public hearing. Option (a) is correct because the central Expert Appraisal Committee appraises Category A projects. Option (b) is correct because the State Environment Impact Assessment Authority is the regulator for Category B. Option (d) is correct because consultation has both parts. Value addition: screening is the only stage that applies to Category B projects alone.

Q4. Under the EIA Notification, 2006, which authority arranges to video film the entire proceedings of a public hearing?

  • (a) The State Pollution Control Board or Union Territory Pollution Control Committee
  • (b) The District Magistrate’s office alone
  • (c) The Expert Appraisal Committee
  • (d) The project proponent
Show answer

Answer: (a) Explanation: Appendix IV says the State Pollution Control Board or the Union Territory Pollution Control Committee must arrange to video film the entire proceedings. A copy goes with the proceedings to the regulatory authority. In Assam, the Assam Pollution Control Board notification for the 30 October Topatoli hearing provided for video recording. Option (b) is wrong because the District Magistrate or a representative presides but does not run the recording. Option (c) is wrong because the committee appraises the project at a later stage. Option (d) is wrong because the proponent only applies and presents its project. Value addition: PARIVESH, launched in August 2018, is the Environment Ministry’s single-window portal for environment, forest, wildlife and Coastal Regulation Zone clearances.