APSC Answer Writing (Daily) based on Assam Tribune – 19/01/2026
For APSC CCE and other Assam Competitive examinations aspirants, practicing Daily Answer Writing is vital. This blog covers the most important Main question and its model Answer from the Assam Tribune today (19-01-2026).
GS Mains Model Question
Q. Infrastructure development in ecologically sensitive regions requires innovative planning to balance economic needs with environmental conservation.
In this context, critically examine the significance and challenges of the Kaziranga Elevated Corridor Project in Assam.
(15 marks)
Model Answer
Introduction
The Assam Tribune (19 January 2026) reported the laying of the foundation stone for the Kaziranga Elevated Corridor Project, a four-lane highway initiative along NH-715 with a long elevated stretch passing through the Kaziranga landscape. Situated in a floodplain ecosystem and a globally significant wildlife habitat, Kaziranga presents a classic case where infrastructure expansion intersects with environmental conservation, necessitating innovative and sustainable solutions.
Body
A. Significance of the Kaziranga Elevated Corridor
- Wildlife Conservation
- Kaziranga experiences annual floods, compelling animals to move toward higher ground.
- The elevated corridor enables uninterrupted wildlife movement, reducing animal–vehicle collisions and habitat fragmentation.
- Climate and Flood Resilience
- Elevated infrastructure allows natural flow of floodwaters, unlike embankments that disrupt hydrology.
- Aligns infrastructure planning with floodplain ecology.
- Sustainable Infrastructure Model
- Represents a shift from conflict-driven development to mitigation-based engineering solutions.
- Can serve as a template for infrastructure projects in other ecologically sensitive regions.
- Economic and Regional Connectivity
- NH-715 is a critical arterial route for Upper Assam.
- Improved road safety and connectivity support trade, mobility, and regional development.
B. Challenges and Concerns
- Construction-Phase Ecological Disturbance
- Noise, vibration, and human presence during construction may temporarily stress wildlife.
- Governance and Compliance
- Environmental benefits depend on strict adherence to design norms and continuous monitoring.
- Operational Regulation
- Long-term success requires enforcement of:
- Speed limits
- Ban on parking and commercial activities beneath the corridor
- Replication Risk
- Blind replication of such projects elsewhere without site-specific ecological assessment may be counterproductive.
Conclusion
As highlighted in the Assam Tribune, the Kaziranga Elevated Corridor Project reflects an evolving approach to infrastructure development that accommodates ecological realities rather than overriding them. While the project holds promise in reconciling connectivity with conservation, its success will depend on scientific execution, regulatory discipline, and long-term environmental oversight. If implemented effectively, it can emerge as a benchmark for sustainable infrastructure planning in Assam and beyond.
✨ Looking for top-quality APSC Mains Guidance with Personalised Mentor?

🔔 Join Our WhatsApp Study Group!
For exclusive access to premium quality content, including study materials, current affairs, MCQs, and model answers for APSC CCE and other Assam competitive exams.
Click here to join: SuchitraACS Study WhatsApp Group
📚 Want to know more about SuchitraACS’s most affordable courses?
Click here to know more: SuchitraACS Courses for APSC CCE and Assam Competitive Examinations




